On the performance of VSI Shewhart control chart for monitoring the coefficient of variation in the presence of measurement errors
519
VSI control chart
Measurement errors
[STAT.AP]Statistics [stat]/Applications [stat.AP]
Coefficient of variation
[MATH.MATH-ST]Mathematics [math]/Statistics [math.ST]
[INFO.INFO-SY]Computer Science [cs]/Systems and Control [cs.SY]
0101 mathematics
[INFO.INFO-MO]Computer Science [cs]/Modeling and Simulation
01 natural sciences
DOI:
10.1007/s00170-019-03352-7
Publication Date:
2019-02-11T01:48:13Z
AUTHORS (4)
ABSTRACT
In this paper, we propose a variable sampling interval Shewhart control chart to monitor the coefficient of variation (CV) squared, denoted by VSI SH-γ2. The new model overcomes the ARL-biased (average run length) property of the control chart monitoring the CV in a previous study by designing two one-sided charts rather than one two-sided chart. Moreover, the effect of measurement error on the performance of the VSI SH-γ2 control chart is investigated. The incorrect formula for the distribution of the CV in the presence of measurement error in a former study is fixed. Numerical simulations show that the precision errors and accuracy errors do have negative influences on the VSI SH-γ2 chart. An appropriate strategy based on the obtained results is suggested to reduce these negative effects.
SUPPLEMENTAL MATERIAL
Coming soon ....
REFERENCES (29)
CITATIONS (31)
EXTERNAL LINKS
PlumX Metrics
RECOMMENDATIONS
FAIR ASSESSMENT
Coming soon ....
JUPYTER LAB
Coming soon ....