Research and Practice of Full Plugging Groundwater Technology in Water-Rich TBM Diversion Tunnel
Hydraulic head
DOI:
10.1007/s12205-023-2468-8
Publication Date:
2023-11-22T08:02:32Z
AUTHORS (8)
ABSTRACT
To solve the problem of water discharge in tunnel when passes through low-pressure water-rich fractured stratum, grouting plugging technology is studied. The scheme optimized field test. post-validation research numerically simulated and parameters complete sealing ring are analyzed. results show that: 1) Full can effectively improve funnel effect precipitation with good effect. With decrease permeability coefficient increase thickness ring, flow velocity around both decreased significantly, a trend "rapidly decreasing-slowly decreasing". Considering various factors, an optimal between 1.5 m 2.5 reasonable range for 2.07 × 10−6 cm/s 4.14 considered appropriate. 2) use cement-water glass system full plugging, significantly reduce water, only partial dripping or even state. Using polyurethane foam single point method to systematically block changes path hardly attenuates discharge.
SUPPLEMENTAL MATERIAL
Coming soon ....
REFERENCES (16)
CITATIONS (0)
EXTERNAL LINKS
PlumX Metrics
RECOMMENDATIONS
FAIR ASSESSMENT
Coming soon ....
JUPYTER LAB
Coming soon ....