Master surgery scheduling with consideration of multiple downstream units
Operating theater
Scope (computer science)
DOI:
10.1016/j.ejor.2014.05.009
Publication Date:
2014-05-20T10:47:08Z
AUTHORS (5)
ABSTRACT
We consider a master surgery scheduling (MSS) problem in which block operating room (OR) time is assigned to different surgical specialties. While many MSS approaches in the literature consider only the impact of the MSS on operating theater and operating staff, we enlarge the scope to downstream resources, such as the intensive care unit (ICU) and the general wards required by the patients once they leave the OR. We first propose a stochastic analytical approach, which calculates for a given MSS the exact demand distribution for the downstream resources. We then discuss measures to define downstream costs resulting from the MSS and propose exact and heuristic algorithms to minimize these costs.
SUPPLEMENTAL MATERIAL
Coming soon ....
REFERENCES (23)
CITATIONS (116)
EXTERNAL LINKS
PlumX Metrics
RECOMMENDATIONS
FAIR ASSESSMENT
Coming soon ....
JUPYTER LAB
Coming soon ....