Construction and application of knowledge graph for grid dispatch fault handling based on pre-trained model
DOI:
10.1016/j.gloei.2023.08.009
Publication Date:
2023-08-31T19:32:17Z
AUTHORS (4)
ABSTRACT
With the construction of new power systems, grid has become extremely large, with an increasing proportion energy and AC/DC hybrid connections. The dynamic characteristics fault patterns are complex; additionally, control is difficult, operation risks high, task handling arduous. Traditional power-grid relies primarily on human experience. difference in lack knowledge reserve personnel restrict accuracy timeliness handling. Therefore, this mode no longer suitable for requirements systems. Based multi-source heterogeneous data dispatch, paper proposes a joint entity–relationship extraction method dispatch processing based pre-trained model, constructs graph designs, develops fault-processing auxiliary decision-making system graph. It was applied to study provincial center, it effectively improved accident ability intelligent level management grid.
SUPPLEMENTAL MATERIAL
Coming soon ....
REFERENCES (24)
CITATIONS (1)
EXTERNAL LINKS
PlumX Metrics
RECOMMENDATIONS
FAIR ASSESSMENT
Coming soon ....
JUPYTER LAB
Coming soon ....