A new process of continuous three-stage co-precipitation of arsenic with ferrous iron and lime

13. Climate action 0211 other engineering and technologies 02 engineering and technology 7. Clean energy 6. Clean water 12. Responsible consumption
DOI: 10.1016/j.hydromet.2014.03.012 Publication Date: 2014-03-29T01:18:27Z
ABSTRACT
Abstract Disposal of acid wastewater containing arsenic (As) from a metallurgical plant was systematically studied and a novel continuous three-stage treatment process was advanced based upon lime-ferrous flocculation technology. At first, the effect of FeSO4·7H2O dosage, temperature, reaction time and neutralization reagent on As removal efficiency was evaluated in a bench scale test. Then, the influence of oxidants (air and bleaching powder) and FeSO4·7H2O dosage on As removal efficiency, was also tested in a pilot scale experiment. Finally, the removal of As from acid wastewater in industrial scale was evaluated based on the obtained optimized parameters from the bench and pilot scale tests. The results showed that the residual As in the final outflow water was less than 0.3 mg/L, which met the demands specified in Emission Standard of Pollutants for the Sulfuric Acid Industry issued by Ministry of Environmental Protection of China (GB26132-2010). The proposed strategy is efficient in utilizing a low cost and promising in industrial application.
SUPPLEMENTAL MATERIAL
Coming soon ....
REFERENCES (26)
CITATIONS (59)
EXTERNAL LINKS
PlumX Metrics
RECOMMENDATIONS
FAIR ASSESSMENT
Coming soon ....
JUPYTER LAB
Coming soon ....