Evaluation system of worker comfort for high geothermal tunnel during construction: A case study on the highway tunnel with the highest temperature in China

0211 other engineering and technologies 02 engineering and technology
DOI: 10.1016/j.tust.2023.105028 Publication Date: 2023-02-08T04:19:38Z