en-usEarly Phase 2 Results of LumiBelle2 for the SuperKEKB Electron Ring

electron data analysis method background [PHYS.PHYS.PHYS-ACC-PH]Physics [physics]/Physics [physics]/Accelerator Physics [physics.acc-ph] photon feedback simulation 01 natural sciences 7. Clean energy luminosity: monitoring Accelerator Physics KEK-B 0103 physical sciences GEANT hardware 06 Beam Instrumentation, Controls, Feedback, and Operational Aspects luminosity T05 Beam Feedback Systems electron: beam solid-state counter: diamond
DOI: 10.18429/jacow-ipac2018-thygbe4 Publication Date: 2018-09-01
ABSTRACT
Proceedings of the 9th Int. Particle Accelerator Conf., IPAC2018, Vancouver, BC, Canada<br/>We report on the early SuperKEKB Phase 2 operations of the fast luminosity monitor (LumiBelle2 project). Fast luminosity monitoring is required by the dithering feedback system, which is used to stabilize the beam in the presence of horizontal vibrations. In this report, we focus on the operations related to the electron side of LumiBelle2. Diamond sensors are located 30 meters downstream of the IP, just above, beside, and below the electron beam pipe. During early Phase 2, the sensors are used to measure the background, arising from beam-gas scattering. We present the hardware design, the detection algorithm, and the analysis of the background measurements taken up-to-date. The results are then compared with a detailed simulation of the background, in order to well understand the physical processes involved. The simulation is performed using SAD for generation and tracking purposes, while Geant4 is used to calculate the energy deposition in the diamond sensors.<br/>
SUPPLEMENTAL MATERIAL
Coming soon ....
REFERENCES ()
CITATIONS ()
EXTERNAL LINKS
PlumX Metrics
RECOMMENDATIONS
FAIR ASSESSMENT
Coming soon ....
JUPYTER LAB
Coming soon ....