Operational Experience of the New Booster Cryomodule at the Upgraded Injector Test Facility
Booster (rocketry)
DOI:
10.2172/2204604
Publication Date:
2023-12-08T03:16:29Z
AUTHORS (11)
ABSTRACT
Since the early 1990s, the injector of the CEBAF accelerator at Jefferson Lab has relied on a normal-conducting RF graded-beta capture section to boost the kinetic energy of the electron beam from 100 / 130 keV to 600 keV for subsequent acceleration using a cryomodule housing two superconducting 5-cell cavities similar to those used throughout the accelerator. To simplify the injector design and improve the beam quality, the normal-conducting RF capture section and the cryomodule will be replaced with a new single booster cryomodule employing a superconducting, β = 0.6, 2-cell-cavity capture section and a single, β = 0.97, 7-cell cavity. The Upgraded Injector Test Facility at Jefferson Lab is currently hosting the new cryomodule to evaluate its performance with beam before installation at CEBAF. While demonstrating satisfactory performance of the booster and good agreement with simulations, our beam test results also speak to limitations of accelerator operations in a noisy, thermally unregulated environment.<br/>Proceedings of the 5th North American Particle Accelerator Conference, NAPAC2022, Albuquerque, NM, USA<br/>
SUPPLEMENTAL MATERIAL
Coming soon ....
REFERENCES (0)
CITATIONS (0)
EXTERNAL LINKS
PlumX Metrics
RECOMMENDATIONS
FAIR ASSESSMENT
Coming soon ....
JUPYTER LAB
Coming soon ....