Operation of Battery Storage as a Temporary Equipment During Grid Reinforcement Caused by Electric Vehicles
ddc:620
02 engineering and technology
battery storage systems
7. Clean energy
620
smart grids
0202 electrical engineering, electronic engineering, information engineering
distribution grids
energy storage systems
EV charging
Engineering & allied operations
info:eu-repo/classification/ddc/620
electric vehicles
DOI:
10.3390/electronics9060888
Publication Date:
2020-05-28T12:27:48Z
AUTHORS (7)
ABSTRACT
Electric vehicle charging stresses distribution grids significantly with high penetrations of electric vehicles. This will lead to grid reinforcement works in several grids. Battery storage is a possible solution bypass times due charging. In this paper, different operation strategies for such battery are tested at first simulations. The main difference between the necessary input data. Following simulations, selected reality project ”Netzlabor E-Mobility-Allee”. It proved that functioning possibility reinforcement.
SUPPLEMENTAL MATERIAL
Coming soon ....
REFERENCES (23)
CITATIONS (2)
EXTERNAL LINKS
PlumX Metrics
RECOMMENDATIONS
FAIR ASSESSMENT
Coming soon ....
JUPYTER LAB
Coming soon ....