Analysis and Control of Layer Deformation Induced by the Densely Arranged Large Diameter Underground Steel Tubes Jacking with NTR Method
Jacking
Groundwater-related subsidence
DOI:
10.4028/www.scientific.net/amm.744-746.1010
Publication Date:
2015-03-23T09:53:49Z
AUTHORS (4)
ABSTRACT
Combined with the finite element method (FEM) and field data of Shenyang Metro NTR engineering for pipe jacking process, variation surface deformation influence factors construction are systematically analyzed. The result is shown that curves lateral subsidence produced by process accord normal distribution put forward Peck .When top steel pipes jacked , develops rapidly rate larger. In addition grouting behind wall sequence all have a greater impact on layer.
SUPPLEMENTAL MATERIAL
Coming soon ....
REFERENCES (7)
CITATIONS (0)
EXTERNAL LINKS
PlumX Metrics
RECOMMENDATIONS
FAIR ASSESSMENT
Coming soon ....
JUPYTER LAB
Coming soon ....