Xiangfei Lyu

ORCID: 0000-0003-1110-2232
Publications
Citations
Views
---
Saved
---
About
Contact & Profiles
Research Areas
  • Scheduling and Optimization Algorithms
  • Assembly Line Balancing Optimization
  • Resource-Constrained Project Scheduling
  • Advanced Manufacturing and Logistics Optimization

Chongqing University
2019-2021

Usually, machine and automated guided vehicle (AGV) scheduling are studied simultaneously. However, previous studies often used a fixed number of AGVs or did not consider routing problems transportation time. This paper focuses on the AGV problem in flexible manufacturing system by simultaneously considering optimal AGVs, shortest time, path planning problem, conflict-free (CFRP). To study these simultaneously, we propose genetic algorithm combined with Dijkstra that is based time window....

10.1109/access.2019.2919109 article EN cc-by-nc-nd IEEE Access 2019-01-01
Coming Soon ...