- Scheduling and Optimization Algorithms
- Advanced Manufacturing and Logistics Optimization
- Assembly Line Balancing Optimization
- Manufacturing Process and Optimization
- Advanced Control Systems Optimization
- BIM and Construction Integration
- Optimization and Search Problems
- Optimization and Packing Problems
- Vehicle Routing Optimization Methods
- Robotic Path Planning Algorithms
- Metaheuristic Optimization Algorithms Research
- Urban and Freight Transport Logistics
- Energy Efficiency and Management
- Urban Transport and Accessibility
- Transportation and Mobility Innovations
- Product Development and Customization
- Smart Grid Energy Management
- Process Optimization and Integration
- Integrated Energy Systems Optimization
- Scheduling and Timetabling Solutions
- Advanced Multi-Objective Optimization Algorithms
- Advanced Image Processing Techniques
- Control and Dynamics of Mobile Robots
- Engineering Technology and Methodologies
- Vehicular Ad Hoc Networks (VANETs)
Liaocheng University
2019-2025
University of Macau
2023
Anhui Medical University
2023
Technical Institute of Physics and Chemistry
2022
University of Chinese Academy of Sciences
2022
Huazhong University of Science and Technology
2016-2020
Hohai University
2018-2020
China Jiliang University
2014
This paper investigates an energy-efficient hybrid flowshop scheduling problem with the consideration of machines different energy usage ratios, sequence-dependent setups, and machine-to-machine transportation operations. To minimize makespan total consumption simultaneously, a mixed-integer linear programming (MILP) model is developed. solve this problem, three-stage multiobjective approach based on decomposition (TMOA/D) suggested, in which each solution bound main weight vector set its...
Disassembly is indispensable to recycle and remanufacture end-of-life products, a disassembly line-balancing problem (DLBP) studied frequently. Recent research on lines has focused complete for optimising the balancing ability of lines. However, partial process widely applied in current industry practice, which aims at reusing valuable components maximising profit (or minimising cost). In this paper, we consider profit-oriented (PPDLBP), mathematical model established, achieve maximisation...
This paper investigates an energy-conscious hybrid flow shop scheduling problem with unrelated parallel machines (HFSP-UPM) the energy-saving strategy of turning off and on. We first analyse energy consumption HFSP-UPM formulate five mixed integer linear programming (MILP) models based on two different modelling ideas namely idle time energy. All are compared both in size computational complexities. The results show that MILP vary dramatically is NP-Hard, thus, improved genetic algorithm...
With the development of global and decentralised economies, distributed production emerges in large manufacturing firms. A model exists with hybrid flowshops. As an extension flowshop scheduling problem (HFSP), (DHFSP) sequence dependent setup times (SDST) is a new challenging project. The DHFSP involves three sub-problems: first one to allocate factory for each job; second determine job factory; third machine at stage. This paper presents position-based mathematical discrete artificial bee...
With the rapid development of computer technology and related softwares for mathematical models, modelling scheduling problems is receiving growing attention from researchers. In this work, hybrid flow shop problem with unrelated parallel machines (HFSP-UPM) objective aimed to minimise makespan studied. According characteristics HFSP-UPM, eight mixed integer linear programming (MILP) models are formulated in order obtain optimal solutions based on different ideas. Then, these extended solve...
In real manufacturing environments, the number of automatic guided vehicles (AGV) is limited. Therefore, scheduling problem that considers a limited AGVs much nearer to production and very important. this paper, we studied flexible job shop with (FJSP-AGV) propose an improved genetic algorithm (IGA) minimize makespan. Compared classical algorithm, population diversity check method was specifically designed in IGA. To evaluate effectiveness efficiency IGA, it compared state-of-the-art...
In this paper, a distributed no-wait permutation flowshop scheduling problem with preventive maintenance operation (PM/DNWPFSP) is investigated. A mixed-integer linear programming model for the PM/DNWPFSP established. The characteristics and of are analyzed, an accelerated calculation method completion time proposed. hybrid artificial bee colony (HABC) algorithm iterated local search mechanism neighborhood To improve quality solution, shift, swap operators conducted in critical factory....