Design storm studies for the Upper Krishna river catchment upstream of the Almatti dam site
13. Climate action
15. Life on land
0101 mathematics
01 natural sciences
6. Clean water
DOI:
10.1007/bf00864045
Publication Date:
2004-12-23T12:04:42Z
AUTHORS (5)
ABSTRACT
The Almatti dam is the major engineering feature in the development of water resources in the Upper Krishna river forming a storage reservoir of 6425 million m3 at spillway crest level. In this paper, the design storm rainfalls for different return periods and also the Probable Maximum Precipitation (PMP) for the catchment above Almatti dam have been estimated to review the adequacy of the flood spillway design for the dam. The design storm rainfalls of various return periods have been computed from a statistical analysis of point and areal time series of annual maximum rainfall. In evaluating the PMP, the maximum observed rainfall obtained by Depth Duration method were maximized as the orography of the Western Ghats plays profound influence over the catchment. It was found that (area 35925 km2) the highest areal rainfalls over the catchment were 14.0 cm, 21.5 cm and 24.6 cm in 1, 2 and 3-day durations, respectively. These are scaled up by a factor of 1.23 to obtain the PMP rainfalls. The areal PMP estimates for the upper Krishna River (UKR) catchment above Almatti dam have been found to be 18.0 cm, 27.0 cm and 31.0 cm, respectively.
SUPPLEMENTAL MATERIAL
Coming soon ....
REFERENCES (8)
CITATIONS (5)
EXTERNAL LINKS
PlumX Metrics
RECOMMENDATIONS
FAIR ASSESSMENT
Coming soon ....
JUPYTER LAB
Coming soon ....