An effective approach for the dual-resource flexible job shop scheduling problem considering loading and unloading
0211 other engineering and technologies
HD28
02 engineering and technology
DOI:
10.1007/s10845-020-01697-5
Publication Date:
2020-11-13T03:02:46Z
AUTHORS (4)
ABSTRACT
AbstractMany manufacturing systems need more than one type of resource to co-work with. Commonly studied flexible job shop scheduling problems merely consider the main resource such as machines and ignore the impact of other types of resource. As a result, scheduling solutions may not put into practice. This paper therefore studies the dual resource constrained flexible job shop scheduling problem when loading and unloading time (DRFJSP-LU) of the fixtures is considered. It formulates a multi-objective mathematical model to jointly minimize the makespan and the total setup time. Considering the influence of resource requirement similarity among different operations, we propose a similarity-based scheduling algorithm for setup-time reduction (SSA4STR) and then an improved non-dominated sorting genetic algorithm II (NSGA-II) to optimize the DRFJSP-LU. Experimental results show that the SSA4STR can effectively reduce the loading and unloading time of fixtures while ensuring a level of makespan. The experiments also verify that the scheduling solution with multiple resources has a greater guiding effect on production than the scheduling result with a single resource.
SUPPLEMENTAL MATERIAL
Coming soon ....
REFERENCES (40)
CITATIONS (50)
EXTERNAL LINKS
PlumX Metrics
RECOMMENDATIONS
FAIR ASSESSMENT
Coming soon ....
JUPYTER LAB
Coming soon ....