A methodology to determine the power performance of wave energy converters at a particular coastal location

0211 other engineering and technologies 0202 electrical engineering, electronic engineering, information engineering 14. Life underwater 02 engineering and technology 7. Clean energy
DOI: 10.1016/j.enconman.2012.03.008 Publication Date: 2012-04-13T07:41:03Z
ABSTRACT
The assessment of the power performance of a wave energy converter (WEC) at a given site involves two tasks: (i) the characterisation of the wave resource at the site in question, and (ii) the computation of its power performance. These tasks are generally seen as disconnected, and tackled as such; they are, however, deeply interrelated – so much so that they should be treated as two phases of the same procedure. Indeed, beyond the characterisation of the wave resource of a certain area lies a crucial question: how much power would a WEC installed in that area output to the network? This work has two main objectives. First, to develop a methodology that integrates both tasks seamlessly and guarantees the accurate computation of the power performance of a WEC installed at a site of interest; it involves a large dataset of deepwater records and the implementation of a high-resolution, nested spectral model, which is used to propagate 95% of the total offshore wave energy to the WEC site. The second objective is to illustrate this methodology with a case study: an Oscillating Water Column (OWC) projected to be constructed at the breakwater of A Guarda (NW Spain). It is found that the approach presented allows to accurately determine the power that the WEC will output to the network, and that this power exhibits a significant monthly variability, so an estimate of the energy production based on mean annual values may be misleading.
SUPPLEMENTAL MATERIAL
Coming soon ....
REFERENCES (45)
CITATIONS (125)
EXTERNAL LINKS
PlumX Metrics
RECOMMENDATIONS
FAIR ASSESSMENT
Coming soon ....
JUPYTER LAB
Coming soon ....