A continuous model for supply planning of assembly systems with stochastic component procurement times
Optimization
0209 industrial biotechnology
Random lead-times
02 engineering and technology
[SDE.ES]Environmental Sciences/Environment and Society
Supply planning
[SDE.ES]Environmental Sciences/Environmental and Society
Assembly-to-order
Simulated annealing
510
620
DOI:
10.1016/j.ijpe.2008.11.015
Publication Date:
2009-01-19T09:20:48Z
AUTHORS (3)
ABSTRACT
This paper studies a customized product assembly scenario where some components cannot be stocked due to high component cost and risk. We consider the case where these key components are ordered after a demand has been registered with a promised delivery date. Component lead-times are stochastic and associated distribution function is known in advance. The objective is to determine the ordering time for each component such as to minimize the sum of expected holding and backlogging costs. An approach to solve this problem is proposed and the algorithm is tested on a randomly generated data set.
SUPPLEMENTAL MATERIAL
Coming soon ....
REFERENCES (19)
CITATIONS (33)
EXTERNAL LINKS
PlumX Metrics
RECOMMENDATIONS
FAIR ASSESSMENT
Coming soon ....
JUPYTER LAB
Coming soon ....