Simulation Model of Belgrade Suburban Passenger Trains Service Using OpenTrack
Center (category theory)
Section (typography)
DOI:
10.20544/tts2021.1.1.21.p26
Publication Date:
2022-04-07T12:19:21Z
AUTHORS (3)
ABSTRACT
Abstract – In this paper, simulation models, created in the OpenTrack tool, were used to compare proposed timetable with a variant which all trains from and Lazarevac would be extended Belgrade Center. This paper aims analyze effects of increasing number on part railway junction Resnik The results have shown that section Dedinje has more than enough capacity for increased trains. Also, show us when increases by 40%, BG can operate without or acceptable delays. Keywords railway, simulation, voz, OpenTrack.
SUPPLEMENTAL MATERIAL
Coming soon ....
REFERENCES (0)
CITATIONS (0)
EXTERNAL LINKS
PlumX Metrics
RECOMMENDATIONS
FAIR ASSESSMENT
Coming soon ....
JUPYTER LAB
Coming soon ....