Heuristics for Scheduling an Assembly Problem with Lobster Precedences and Resource Constraint
Heuristics
Resource constraints
DOI:
10.2139/ssrn.4472425
Publication Date:
2023-06-07T13:19:32Z
AUTHORS (3)
ABSTRACT
In this work, we consider a scheduling problem faced by company involved in the production of off-road vehicles using three-level assembly process, subject to precedence, machines, and resource constraints. This has multiple characteristics shared with other problems, including specific precedence structure resulting Lobster graph, constraint limiting number simultaneously active an identical sequence present all jobs. To best our knowledge, no prior publications have ever addressed interplay these characteristics. We mathematical formulation adapt heuristic algorithms from related problems. also introduce two-step decomposition method tailored leverage structure, along simple pre-processing select most suitable algorithm based on input instance. extensively evaluate proposals two benchmark sets reflecting industrial use cases, various shop floor configurations, eight real-life scenarios. Our results demonstrate effectiveness highlight superiority compared proposals. Lastly, analysis reveals general importance correctly handling jobs, although certain conditions constraints may reduce its relevance.
SUPPLEMENTAL MATERIAL
Coming soon ....
REFERENCES (26)
CITATIONS (0)
EXTERNAL LINKS
PlumX Metrics
RECOMMENDATIONS
FAIR ASSESSMENT
Coming soon ....
JUPYTER LAB
Coming soon ....