construction techniques and performances of a full size prototype micromegas chamber for the atlas muon spectrometer upgrade

Micromegas; Muon detector Physics - Instrumentation and Detectors Particle physics 500 FOS: Physical sciences Instrumentation and Detectors (physics.ins-det) Physics Instrumentation and Detectors; High Energy Physics Experiment; Micromegas; Muon detector 530 01 natural sciences Muon detector High Energy Physics - Experiment High Energy Physics - Experiment (hep-ex) 03 medical and health sciences 0302 clinical medicine 0103 physical sciences High energy physics Muon detector, Micromegas Micromegas
DOI: 10.48550/arxiv.1808.09752 Publication Date: 2020-03-01
ABSTRACT
Contact editors: G. Mancini, A. Kourkoumeli-Charalampidi<br/>A full-size prototype of a Micromegas precision tracking chamber for the upgrade of the ATLAS detector at the LHC Collider has been built between October 2015 and April 2016. This paper describes in detail the procedures used in constructing the single modules of the chamber in various INFN laboratories and the final assembly at the Laboratori Nazionali di Frascati (LNF). Results of the chamber exposure to the CERN SPS/H8 beam line in June 2016 are also presented. The performances achieved in the construction and the results of the test beam are compared with the requirements, which are imposed by the severe environment during the data-taking of the LHC foreseen for the next years.<br/>
SUPPLEMENTAL MATERIAL
Coming soon ....
REFERENCES ()
CITATIONS ()
EXTERNAL LINKS
PlumX Metrics
RECOMMENDATIONS
FAIR ASSESSMENT
Coming soon ....
JUPYTER LAB
Coming soon ....