Post-disaster Repair Scheduling in Partially Automated Electricity Distribution Networks

Optimization and Control (math.OC) 0211 other engineering and technologies FOS: Mathematics FOS: Electrical engineering, electronic engineering, information engineering 02 engineering and technology Systems and Control (eess.SY) Mathematics - Optimization and Control Electrical Engineering and Systems Science - Systems and Control
DOI: 10.48550/arxiv.1906.06461 Publication Date: 2019-01-01
ABSTRACT
Natural disasters require repairing all damaged components in electricity distribution networks. Optimal scheduling repair crews to minimize the aggregate duration of interruptions reduces the harm. We consider the fact that the number of switches is much smaller than the number of edges. The problem is modeled by a parallel identical machine scheduling with group soft precedence constraints to minimize the total weighted energization time. We propose an LP-based list scheduling algorithm and a conversion algorithm and analyze their theoretical performances.
SUPPLEMENTAL MATERIAL
Coming soon ....
REFERENCES ()
CITATIONS ()
EXTERNAL LINKS
PlumX Metrics
RECOMMENDATIONS
FAIR ASSESSMENT
Coming soon ....
JUPYTER LAB
Coming soon ....