Tidal River Sediment Management–A Case Study in Southwestern Bangladesh
MIKE 21 Flow Model FM
Beel
13. Climate action
0207 environmental engineering
02 engineering and technology
14. Life underwater
15. Life on land
Tidal River Management.
6. Clean water
embankment
DOI:
10.5281/zenodo.1088434
Publication Date:
2013-09-01
AUTHORS (5)
ABSTRACT
{"references": ["D. K. Datta, L. P. Gupta, and V. Subramanian, \"Distribution of C, N and\nP in the sediments of the Ganges\u2013Brahmaputra\u2013Meghna river system in\nthe Bengal basin,\" Organic Geochemistry, vol 30, no. 1, pp. 75-82. Jan.\n1999.", "A. Mukherjee, A. E. Fryar, and W. A. Thomas, \"Geologic, geomorphic\nand hydrologic framework and evolution of the Bengal basin, India and\nBangladesh, \" Journal of Asian Earth Sciences, vol. 34, no. 3, pp. 227-\n244, Mar. 2009.", "S. A. Kuehl, T. M. Hariu, and W. S. Moore, \"Shelf sedimentation off the\nGanges-Brahmaputra river system: Evidence for sediment bypassing to\nthe Bengal fan,\" Geology, vol. 17, no. 12, pp. 1132-1135, Dec. 1989.", "Institute of Water Modelling, \"Mathematical Modelling Study for\nPlanning and Design of Beel Kapalia Tidal Basin,\" Dhaka, Bangladesh,\n2009.", "Institute of Water Modelling, \"Monitoring of Hydrological and\nHydraulic Parameters on Tidal River Management under KJDRP\nArea,\" Dhaka, Bangladesh, 2005.", "Institute of Water Modelling, \"Monitoring the Effects of Beel Khuksia\nTRM Basin and Dredging of Hari River for Drainage Improvement of\nBhabodah Area,\" Dhaka, Bangladesh, 2005.", "C. A. Williams, \"History of the Rivers in the Gangetic Delta 1750-\n1918,\" Netherlands Engineering Consultants, The Hague, Holland,\n1919. East Pakistan Inland Water Transport Authority, Bengal\nSecretariat Press, Calcutta, 1966 (reprinted).", "M. R. Rahman, \"Investigation into Replicability of Good Practices in\nFlood Management,\" Institute of Water and Flood Management,\nBangladesh University of Engineering and Technology, Dhaka,\nBangladesh, 2008.", "SMEC, \"Sediment and River Morphology Study Khulna-Jessore\nDrainage Rehabilitation Project,\" Bangladesh Water Development\nBoard, Bangladesh, 1997.\n[10] CEGIS, \"Monitoring and Integration of the Environmental and Socioeconomic\nImpacts of Implementing the Tidal River Management Option\nto Solve the Problem of Drainage congestion in KJDRP Area,\" Part A:\nMonitoring, Dhaka, Bangladesh, 2002.\n[11] CEGIS, \"Monitoring and Integration of the Environmental and Socioeconomic\nImpacts of Implementing the Tidal River Management Option\nto Solve the Problem of Drainage congestion in KJDRP Area,\" Part D:\nWMA-O&M Plan, Dhaka, Bangladesh, 2002.\n[12] SMEC, \"Feasibility Study Report for Overall Drainage Plan Khulna-\nJessore Drainage Rehabilitation Project,\" Bangladesh Water\nDevelopment Board, Bangladesh, 1997.\n[13] M. Alvarez-Guerra, L. Canis, N. Voulvoulis, J. R. Viguri, and I. Linkov,\n\"Prioritization of sediment management alternatives using stochastic\nmulticriteria acceptability analysis,\" Science of The Total Environment,\nvol 408, no. 20, pp. 4354-4367, Sep. 2010.\n[14] M. E. Brown, \"Assessing Natural Resource Management Challenges in\nSenegal Using Data from Participatory Rural Appraisals and Remote\nSensing,\" World Development, vol 34, no. 4, pp. 751-767, Apr. 2006.\n[15] J. Kim, S. H. Kim, G. H. Hong, B. C. Suedel, and J. Clarke,\n\"Multicriteria decision analysis to assess options for managing\ncontaminated sediments: Application to Southern Busan Harbor, South\nKorea,\" Integrated Environmental Assessment and Management, vol. 6,\nno. 1, pp. 61-71, Nov. 2009.\n[16] R. S. I. A. J. Ling, \"The PRA tools for qualitative rural tourism\nresearch,\" Systems Engineering Procedia, vol. 1, pp. 392-398, 2011.\n[17] R. Chambers, \"Participatory rural appraisal (PRA): Challenges,\npotentials and paradigm,\" World Development, vol. 22, no. 10, pp. 1437-\n1454, Oct. 1994.\n[18] R. J. Hardy, P. D. Bates, and M. G. Anderson, \"Modelling suspended\nsediment deposition on a fluvial floodplain using a two-dimensional\ndynamic finite element model,\" Journal of Hydrology, vol. 229, no. 3\u20134,\npp. 202-218, Apr. 2000.\n[19] C. S. James, \"Sediment transfer to overbank sections,\" Journal of\nHydraulic Research, vol. 23, no. 5, pp. 435-452, Jun. 1985.\n[20] DHI, \"User guide: Mud Transport Module of MIKE 21 Flow Model,\"\nDenmark, 2007.\n[21] DHI, \"Scientific Background: Mud Transport Module of MIKE 21 Flow\nModel,\" Denmark, 2007.\n[22] R. Paliwal, and R. R. Patra, \"Applicability of MIKE 21 to assess\ntemporal and spatial variation in water quality of an estuary under the\nimpact of effluent from an industrial estate,\" Water science and\ntechnology : a journal of the International Association on Water\nPollution Research, vol. 63, no. 9, pp. 1932-1943, 2011.\n[23] M. Pejrup, \"Flocculated suspended sediment in a micro-tidal\nenvironment,\" Sedimentary Geology, vol. 57, no. 3\u20134, pp. 249-256, Jun.\n1988.\n[24] T. N. Burt, \"Field settling velocities of estuary muds,\" Lecture Notes on\nCoastal and Estuary Studies, vol. 14, pp. 126-150, 1986.\n[25] R. B. Krone, \"The significance of aggregate properties to transport\nprocesses,\" Lecture Notes on Coastal and Estuary Studies, vol. 14, pp.\n66-84, 1986."]}<br/>The problems of severe drainage congestion and water logging in the southwestern Bangladesh have been solved by an innovative concept, Tidal River Management (TRM). TRM involves the uniform raising of the land inside a tidal basin (beel) while simultaneously maintaining the proper drainage capacity in the river. The present practice of TRM is to link the river with the selected beel by constructing a link canal at the entrance of which most of the sedimentation takes place. This localized sedimentation also creates drainage congestion and water logging making it unattractive to landowners who participate in the program. In this paper a functional sediment management plan is presented to get rid of this problem<br/>
SUPPLEMENTAL MATERIAL
Coming soon ....
REFERENCES ()
CITATIONS ()
EXTERNAL LINKS
PlumX Metrics
RECOMMENDATIONS
FAIR ASSESSMENT
Coming soon ....
JUPYTER LAB
Coming soon ....