- Scheduling and Optimization Algorithms
- Assembly Line Balancing Optimization
- Advanced Manufacturing and Logistics Optimization
- Manufacturing Process and Optimization
- Multi-Criteria Decision Making
- Vehicle Routing Optimization Methods
- Optimization and Packing Problems
- Scheduling and Timetabling Solutions
- Optimization and Search Problems
- Optimization and Mathematical Programming
- Quality Function Deployment in Product Design
- Sustainable Supply Chain Management
- Facility Location and Emergency Management
- Urban and Freight Transport Logistics
Karadeniz Technical University
2013-2023
Istanbul Technical University
2015-2020
The distributed permutation flow shop scheduling (DPFSS) is a problem including the multi-factory environment. processing times of jobs in real life cannot be precisely know because human factor. In this study, process and due dates are considered triangular trapezoidal fuzzy numbers for DPFSS An artificial bee colony (ABC) algorithm developed to solve multi-objective (DFPFS) problem. First, proposed ABC calibrated with well-known instances literature. Then, fuzzified solved algorithm....
This paper describes the first Artificial Bee Colony (ABC) Algorithm approach applied to nurse scheduling evaluated under different working environments.For this purpose, model has been on a real hospital where data taken from departments of were used and schedules compared with existing schedules.The results obtained indicated that proposed exhibits success in solving problems hospitals.
Multiprocessor task can be stated as finding a schedule for general graph to execute on multiprocessor system. In this paper an efficient harmony search algorithm (HSA) is proposed solve the hybrid flow shop scheduling with problems (HFSMTP). The best values of HFS's control parameters are determined by full factorial design. Computational results compared genetic related HFSMTP at literature. result showed that HSA effective solving HFSMTP.
Stochastic operation times make job-shop scheduling harder at companies which work based on project type laborintensive production in a dynamic environment.The are not known before and change the orders' technical specifications.In performing required operations with aim of producing final product, is for different purposes such as minimizing makespan, maximizing resource utilization, etc.This important it enables to meet customer demands by due date reduce labor cost finalized product.In...
Bu çalışmada Türkiye’nin Kayseri ilinde faaliyet gösteren bir lojistik firmasının gerçek verileri kullanılarak, firmanın karşı karşıya kaldığı homojen kapasiteli çok araçlı araç rotalama problemi ele alınmıştır. Firma Kayseri’de bulunan depodan, 50 farklı konumda talep noktalarının siparişlerini haftalık periyotlar ile karşılayacak sevkiyat rotasını, elde sayısını aşmadan, minimum maliyet etmek istemektedir. Problemin çözümü için literatürde yer alan lineer matematiksel model OpenSolver...