- Scheduling and Optimization Algorithms
- Advanced Manufacturing and Logistics Optimization
- Assembly Line Balancing Optimization
- Optimization and Packing Problems
- Semiconductor materials and devices
- Metaheuristic Optimization Algorithms Research
- Advanced Control Systems Optimization
- Image and Signal Denoising Methods
- Color perception and design
- Seismic Imaging and Inversion Techniques
- Hydraulic Fracturing and Reservoir Analysis
- Power Quality and Harmonics
- Enhanced Oil Recovery Techniques
- Advanced Memory and Neural Computing
- Advanced Electrical Measurement Techniques
- Geoscience and Mining Technology
- Ferroelectric and Negative Capacitance Devices
- Magnetic Properties and Applications
- Graph Labeling and Dimension Problems
- Advanced Mathematical Modeling in Engineering
University of Tennessee at Knoxville
2024
Changsha University of Science and Technology
2024
University of Science and Technology of China
2016-2022
Zhejiang University of Technology
2013
CAO Group (United States)
1999
Batch-processing machines (BPMs) can process a number of jobs at time, which be found in many industrial systems. This article considers single BPM scheduling problem with unequal release times and job sizes. The goal is to assign into batches without breaking the machine capacity constraint then sort minimize makespan. A self-adaptive differential evolution algorithm developed for addressing problem. In our proposed algorithm, mutation operators are adaptively chosen based on their...
Reducing energy costs has become an important concern for sustainable manufacturing systems, owing to the environment. We present a multi-objective hybrid ant colony optimisation (MHACO) algorithm real-world two-stage blocking permutation flow shop scheduling problem address trade-off between total (TEC) and makespan (Cmax) as measures of service level with time-of-use (TOU) electricity price. explore energy-saving potential industry in consideration differential generated by variable-speed...
This paper focuses on minimising the maximum completion time for two-stage permutation flow shop scheduling problem with batch processing machines and nonidentical job sizes by considering blocking, arbitrary release times, fixed setup cleaning times. Two hybrid ant colony optimisation algorithms, one based sequencing (JHACO) other (BHACO), are proposed to solve this problem. First, max-min pheromone restriction rules a local rule embedded into JHACO BHACO, respectively, avoid trapping in...
This paper studied two-stage permutation flow shop problems with batch processing machines, considering different job sizes and arbitrary arrival times, the optimisation objective of minimising makespan. The quantum-inspired ant colony (QIACO) algorithm was proposed to solve problem. In QIACO algorithm, ants are divided into two groups: one group selects largest in terms size as initial for each other smallest batch. Each has its own pheromone matrix. computational experiment, our novel...
Summary In the traditional numerical reservoir simulations, internodal transmissibility is usually defined as harmonic mean of permeabilities adjacent grids. This definition underestimates phase flux and speed saturation front, especially for strong heterogeneous case. this article, recalculated according to nodal analytic solution. The redefined can be used directly calculate multiphase flow in simulations. Numerical examples show that, compared methods, proposed scheme makes convergences...
Traditional FFT show good trait in steady-state harmonic testing, while it turn low accuracy when testing with voltage sag or transient, and can not illustrates the information on amplitude-time plane. The discrete wavelet transform is suitable for transient signals. However intuitive has more computing than FFT. Since both components exist power system, a new method of analysis algorithm based Kaiser windowed combing Daubechies proposed. simulation results demonstrate this possesses high...
Resistive random access memory (RRAM) becomes one of the solutions embedded under advanced technology node. In this paper, we investigate program disturb issues for half-selected cell in 1T1R array. By utilizing stress testing and RTN measurement, conclude that high source-drain voltage induced excess defects oxide layer is main reason degradation FinFET. Therefore, applied on BL array needs to be controlled guarantee reliability. Keywords: 1T1R, FinFET, cell, disturbance