- Extraction and Separation Processes
- Minerals Flotation and Separation Techniques
- Metal Extraction and Bioleaching
- Adsorption and biosorption for pollutant removal
- Mine drainage and remediation techniques
- Recycling and Waste Management Techniques
- Advancements in Battery Materials
- Algal biology and biofuel production
- Photovoltaic Systems and Sustainability
- Phosphorus and nutrient management
- Heavy metals in environment
- Electrochemical Analysis and Applications
- Mineral Processing and Grinding
- Chromium effects and bioremediation
- Groundwater flow and contamination studies
- Enzyme Catalysis and Immobilization
- Microfluidic and Capillary Electrophoresis Applications
- Environmental remediation with nanomaterials
- Pickering emulsions and particle stabilization
- Edible Oils Quality and Analysis
- Iron oxide chemistry and applications
- Arsenic contamination and mitigation
- Water Quality Monitoring and Analysis
- Radioactive element chemistry and processing
- Environmental Chemistry and Analysis
Environment Park
2019-2024
Università Campus Bio-Medico
2019
Sapienza University of Rome
2007-2016
University of Zulia
2014
University of Genoa
2000-2001
University of L'Aquila
1988-1999
A culture of Arthrobacter sp. was tested for its ability to sorb copper, cadmium, and iron ions, chemical modeling experimental data used interpret the mechanism biosorption. The purpose initial phase clarify nature concentration active acidic sites on cell wall with aid potentiometric titration an aqueous cellular suspension IR analysis lyophilized biomass in solid phase. results showed that probably has at least two weakly sites. In second part work suspended presence ion solutions...
Research and development in photovoltaic panel (PVP) recycling have evolved to maximize recovery, including less valuable but non-renewable materials. Early relied on low-cost physical processes failed produce glass pure enough for the industry, except construction. A process involving crushing, sieving, thermal treatment, fine fraction leaching, wastewater treatment required 75,000 tons/year capacity achieve a payback time under 6 years. High-value recovery requires advanced methods...