Aaron Costin

ORCID: 0000-0003-4263-8101
Publications
Citations
Views
---
Saved
---
About
Contact & Profiles
Research Areas
  • BIM and Construction Integration
  • Nuclear physics research studies
  • Infrastructure Maintenance and Monitoring
  • Atomic and Molecular Physics
  • 3D Surveying and Cultural Heritage
  • Advanced NMR Techniques and Applications
  • Digital Transformation in Industry
  • Indoor and Outdoor Localization Technologies
  • Manufacturing Process and Optimization
  • Quantum Chromodynamics and Particle Interactions
  • Atomic and Subatomic Physics Research
  • Occupational Health and Safety Research
  • Construction Project Management and Performance
  • Advanced Chemical Physics Studies
  • Traffic Prediction and Management Techniques
  • Semantic Web and Ontologies
  • Nuclear Physics and Applications
  • 3D Modeling in Geospatial Applications
  • Sentiment Analysis and Opinion Mining
  • Astronomical and nuclear sciences
  • Quantum, superfluid, helium dynamics
  • Robotics and Sensor-Based Localization
  • IoT and Edge/Fog Computing
  • Facilities and Workplace Management
  • Recycled Aggregate Concrete Performance

University of Florida
2017-2024

Pontifícia Universidade Católica do Paraná
2024

Florida Gulf Coast University
2024

State University of New York
2006-2022

ORCID
2019-2022

Georgia Institute of Technology
2012-2017

Stony Brook University
2005-2012

Technical University of Darmstadt
2006-2010

University of Cologne
2006-2009

Sofia University "St. Kliment Ohridski"
2009

Over the last few decades, built environment and architecture, engineering, construction, operation (AECO) industry have grown in amount of computer software, technologies, automation to help improve all facets industry. This new era smart sustainable urban systems is enabling transformative change way communities are interacting among themselves with become more resilient meet demands growing population. Interoperability has been shown be a major barrier for seamless transfer information...

10.1061/(asce)cp.1943-5487.0000824 article EN Journal of Computing in Civil Engineering 2019-02-14

Cost overrun has remained a key risk of construction projects that can be prevented by utilizing new technologies. This paper aims to identify the gap in literature, which potentially addressed using digital tools and technologies, reviewing current state art practices. The presents results systematic critical content reviews on cost overruns, address question what factors are affecting overrun. also how building information modeling (BIM) conjunction with other tools, such as common Asia...

10.3390/buildings12040396 article EN cc-by Buildings 2022-03-24

Passage of overweighted commercial vehicles is one the significant causes damage to pavement and structural components bridges. Weigh-in-motion (WIM) systems can currently detect real-time traffic data; however, these data are stored in standalone databases. Building information modeling (BIM) has transformed construction industry by injecting "information" into building model integrating different BIM capabilities for bilateral exchange led inception digital twin. This research investigates...

10.1061/(asce)co.1943-7862.0002332 article EN Journal of Construction Engineering and Management 2022-07-13

The integration of Design for Manufacture and Assembly (DfMA) into the design process industrialized construction has potential to reduce errors changes occurring after been finalized, ultimately improving overall productivity. Based on DfMA, designers would need consider whether their designs meet architectural performance requirements, as well manufacturing assembly requirements from technicians. However, some limitations present challenges DfMA-oriented prefabricated design, such lack...

10.3390/buildings13020394 article EN cc-by Buildings 2023-02-01

Abstract Background Finding the current location of a specific utility or oneself in an unfamiliar facility can be difficult and time consuming. The hypothesis tested this paper is that using information contained within Building Information Models (BIM) increase accuracy indoor positioning algorithms context-aware sensing technology. presented work demonstrates how integration passive Radio Frequency Identification (RFID) tracking technology Modeling assist localization for potential...

10.1186/s40327-015-0030-6 article EN cc-by Visualization in Engineering 2015-12-01

Active leading indicators (ALIs) have the potential to identify safety hazards and prompt immediate actions prevent incidents. Currently, there is a major gap in research that incorporates fully automated ALI system because implementation has been hindered by lack of established industry thresholds measurable performance would trigger an actionable response. Therefore, this paper addresses presenting new method utilizes Internet Things (IoT) collect quantifiable data which can response real...

10.3390/safety5040086 article EN cc-by Safety 2019-12-16

In recent years, a growing amount of research has focused on improving the performance industrialized construction using emerging technologies. It is still necessary to have an in-depth understanding industry practitioners’ perspectives application Thus, well-designed survey was distributed practitioners who been involved in projects. Then, set data analysis methods were utilized collected address proposed four specific questions. Results indicate that 3D and nD models, sensing techniques,...

10.3390/buildings10050085 article EN cc-by Buildings 2020-04-30

Locating a specific utility or finding oneself in an unfamiliar facility can be difficult and time consuming. The ability to visualize the location real reduce for manual searching locating. proposed research is utilize commercially available radio frequency identification (RFID) technology real-time visualization tracking BIM model. scope passive RFID Building Information Modeling (BIM). A novel approach presented that utilizes current localization techniques algorithms. prototype...

10.1061/9780784413517.018 article EN Construction Research Congress 2022 2014-05-13

Lifetimes of chiral candidate structures in $^{103,104}\mathrm{Rh}$ were measured using the recoil distance Doppler-shift method. The Gammasphere detector array was used conjunction with Cologne plunger device. Excited states populated by ${}^{11}\mathrm{B}({}^{96}\mathrm{Zr},4n){}^{103}\mathrm{Rh}$ and ${}^{11}\mathrm{B}({}^{96}\mathrm{Zr},3n){}^{104}$Rh fusion-evaporation reactions inverse kinematics. Three five lifetimes levels belonging to proposed doublet bands are $^{103}\mathrm{Rh}$...

10.1103/physrevc.78.031302 article EN Physical Review C 2008-09-22

Bridges are one of the most important elements a sustainable transportation infrastructure network and require significant care to guarantee they function in safe reliable manner. Ensuring effective bridge maintenance life cycle management face aging deterioration requires precise performance data efficient assessment technologies. Because overall mediocre quality U.S. infrastructure, there is crucial need enhance its monitoring management. Digital twin an emerging promising concept that can...

10.1177/03611981231208908 article EN Transportation Research Record Journal of the Transportation Research Board 2023-11-27

The high-spin structure of the $^{105}\mathrm{Ag}$ nucleus has been studied by using $^{100}\mathrm{Mo}$($^{10}\mathrm{B}$, $5n)$$^{105}\mathrm{Ag}$ reaction to search for chiral doublet bands based on three-quasiparticle $\ensuremath{\pi}{g}_{9/2}\ensuremath{\nu}({h}_{11/2}){}^{2}$ configuration. level scheme extended. New were found and placement yrast band was corrected. No side could be in present experiment. This observation indicates that \ensuremath{\gamma}-soft shape...

10.1103/physrevc.76.024307 article EN Physical Review C 2007-08-06

The Pb(γ→,γ′) photon scattering reaction has been studied with the nearly monochromatic, linearly polarized beams at High Intensity γ-ray Source (HIγS) DFELL. Azimuthal intensity asymmetries measured respect to polarization plane of beam have used for first time assign both spin and parity quantum numbers dipole excited states 206,207,208Pb excitation energies in vicinity 5.5 MeV. Evidence dominant particle–core coupling is deduced from these results along information on electromagnetic...

10.1016/j.physletb.2009.09.059 article EN cc-by Physics Letters B 2009-09-30

Prefabricated buildings have been shown to provide a new way of sustainable construction reduce the amount work on sites, pollution, shorten time, and increase safety. However, many issues in actual production process (e.g., quality check, storage, installation prefabricated components) are mainly caused by lack information being collected shared. In order better monitor manage prefabrication efficiently, this research proposes framework that integrates radio frequency identification (RFID)...

10.1061/9780784481264.058 article EN Construction Research Congress 2022 2018-03-29

Innovation and technological developments are integral parts of the architecture, engineering, construction (AEC) industry. While AEC practitioners strive to have unique projects, there is a concern about unauthorized use or reproduction their designs. Architectural drawings been recognized as intellectual property by US copyright law, if an architect follows proper procedures for registration, designs would protection against use. Copyright infringement can happen either deliberately...

10.1061/(asce)la.1943-4170.0000421 article EN Journal of Legal Affairs and Dispute Resolution in Engineering and Construction 2020-06-12

The recent push to adopt building information modeling (BIM) for bridges and structures in the transportation industry has encountered major barriers owing lack of standardization. Unlike that National BIM Standard®–United States (NBIMS-US™) as a formal open platform standard guide development interoperable software, does not currently have similar enable creation software serve needs stakeholders. purpose this paper is present findings research one first use cases data exchange requirements...

10.1177/03611981211018691 article EN Transportation Research Record Journal of the Transportation Research Board 2021-07-16

In the recent years, industrialized construction (IC) is moving industry toward integrating emerging manufacturing technologies into offsite and factory component assembly practices to improve productivity efficiency. The key success in IC business providing mass customization production simultaneously, which only possible a highly flexible system. experiencing fourth industrial revolution blurring separation of physical, cyber, biological worlds. primary objective this study identify new...

10.1061/9780784482438.045 article EN Computing in Civil Engineering 2019-06-13
Coming Soon ...