Jolanta Tamošaitienė

ORCID: 0000-0003-4692-6821
Publications
Citations
Views
---
Saved
---
About
Contact & Profiles
Research Areas
  • Construction Project Management and Performance
  • Multi-Criteria Decision Making
  • BIM and Construction Integration
  • Occupational Health and Safety Research
  • Sustainable Building Design and Assessment
  • Risk and Safety Analysis
  • Public-Private Partnership Projects
  • Facilities and Workplace Management
  • Public Procurement and Policy
  • Construction Management and Sustainability
  • Optimization and Mathematical Programming
  • Socio-economic Development and Sustainability
  • Sustainable Supply Chain Management
  • Strategic Planning and Analysis
  • Underground infrastructure and sustainability
  • Economic and Technological Systems Analysis
  • Life Cycle Costing Analysis
  • Complex Systems and Decision Making
  • Market Dynamics and Volatility
  • Value Engineering and Management
  • Advanced Energy Technologies and Civil Engineering Innovations
  • Economic and Business Development Strategies
  • Quality and Supply Management
  • Quality and Management Systems
  • Geodetic Measurements and Engineering Structures

Vilnius Gediminas Technical University
2014-2025

Aquarius (Slovenia)
2012

The paper presents risk assessment of construction projects. is based on the multi‐attribute decision‐making methods. evaluation attributes are selected taking into consideration interests and goals stakeholders as well factors that have influence process efficiency real estate value. Ranking objects determination their optimality determined by applying TOPSIS grey COPRAS‐G methods with values at intervals. A background a description proposed model provided key findings analysis presented....

10.3846/jcem.2010.03 article LT cc-by Journal of Civil Engineering and Management 2010-03-30

The higher life quality standards, the changes of habits and new well‐being requirements have led to an increase in demand for housing. Decision‐making problems construction management often involve a complex decision‐making process which multiple conditions be taken into consideration simultaneously. However, not every attribute used multidimensional scaling is equally precisely weighted real world. Thus quantitative qualitative assessments are required deal with uncertainty, subjective...

10.3846/1392-3730.2008.14.3 article EN cc-by Journal of Civil Engineering and Management 2008-06-22

Risk management is an important field of construction industry and has gained more importance internationally due to the latest researches carried out on a large scale. However, this relatively new requires attention bring some benefit. Construction projects are facing number risks which have negative effects project objects such as time, cost quality. This study based findings questionnaire-based survey risk in Pakistan, reporting significance different type risk, ultimate responsibility...

10.3846/20294913.2014.994582 article EN cc-by Technological and Economic Development of Economy 2015-01-29

Greening the supply chain is an increasingly important concern for many business enterprises and a challenge logistics management. Critical functions within green management are internal improvements selection of suppliers. This study proposes novel, hybrid model that addresses dependent relationships between various criteria vague information coming from decision-makers. The Decision-making Trial Evaluation Laboratory (DEMATEL) technique structures among criteria, thereby constructing...

10.1080/00207543.2015.1010747 article EN International Journal of Production Research 2015-02-23

Multi-attribute analysis is a useful tool in many economical, managerial, constructional, etc. problems.The accuracy of performance measures COPRAS (The multi-attribute COmplex PRoportional ASsessment alternatives) method usually assumed to be accurate.This assumes direct and proportional dependence the weight utility degree investigated versions on system attributes adequately describing alternatives values weights attributes.However, there some uncertainty involved all model inputs.The...

10.15388/informatica.2009.252 article EN Informatica 2009-01-01

There is a number of criteria and associated sub‐criteria influencing the match managers to construction projects. Criteria were identified based on thorough review related literature interviews management personnel involved in project selection. Project characteristics are considered be less important for an effective management. The model multicriteria evaluation managers. embraces process manager This paper considers application grey relations methodology defining utility alternatives,...

10.3846/1392-8619.2008.14.462-477 article LT cc-by Technological and Economic Development of Economy 2008-12-24

The concept of the agile supply chain has been taken into account as means achieving a high competitive edge in rapidly changing business environments. Supply partner selection is one most appealing issues for management, which have recently studied by academicians and practitioners. Due to large number factors be considered, supplier process difficult task every company. Therefore, can viewed multiple attribute decision-making (MADM) problem. In this paper, novel hybrid MADM method proposed...

10.3846/20294913.2013.814606 article EN cc-by Technological and Economic Development of Economy 2013-10-03

The accuracy of performance measures in common multicriteria methods is usually assumed to be accurate. Grey theory a new technique for performing prediction, relational analysis and decision‐making many areas. This paper presents applicability grey techniques defining the utility an alternative. Proposed assessment model covers well known method TOPSIS (Technique Order Preference by Similarity Ideal Solution), with attributes values determined at intervals (TOPSIS‐grey) Simple Additive...

10.3846/jbem.2010.03 article LT cc-by Journal of Business Economics and Management 2010-03-31

Construction processes planning and effective management are extremely important for success in construction business. Head of a design must be well experienced initiating, planning, executing projects. Therefore, proper assessment projects' managers is vital part process. The paper deals with an methodology that might serve as decision support aid assessing project managers. Project managers' different characteristics considered to more or less the project. Qualifying based on laws force...

10.1142/s0219622012400135 article EN International Journal of Information Technology & Decision Making 2012-03-01

Multi-stakeholder based construction projects are subject to potential risk factors due dynamic business environment and stakeholders’ lack of knowledge. When solving project management tasks, it is necessary quantify the main indicators projects. Managing these requires suitable mitigation strategies evaluate analyse their severity. The existence information asymmetry also causes difficulties with achieving Pareto efficiency. Hence, ensure balanced satisfaction all participants, evaluation...

10.3390/sym10020046 article EN Symmetry 2018-02-13

Existing risks in deep foundation excavation projects is a major issue developing cities. With the rapid in-crease number of various and big cities Iran, many accidents related to have been reported every year. These affected delay increased cost project implemen-tation. Therefore identification assessment these essential. The aim research was develop framework overcome limitations previous approaches assess projects. According complexity problem inherent uncertainty, adopted SWARA...

10.3846/13923730.2017.1281842 article EN Journal of Civil Engineering and Management 2017-04-21

Nowadays, sustainable development has been introduced and integrated into production operation management field through the concept of green supply chain. Green regulations principles have gained interest managers practitioners in selecting innovative practices for suppliers organisations. Accordingly, present study aims to evaluate relationship between a supplier, innovation, environmental performance, competitive advantage cement industry, which is an important industry Iran. This...

10.3846/20294913.2015.1065521 article EN cc-by Technological and Economic Development of Economy 2015-11-01

An organization’s strategic objectives are accomplished through portfolios. However, the materialization of portfolio risks may affect a portfolio’s sustainable success and achievement those objectives. Moreover, project interdependencies cause–effect relationships between create complexity for risk analysis. This paper presents model using Bayesian network (BN) methodology modeling analyzing risks. To develop this model, first, portfolio-level caused by identified. Then, based on their all...

10.3390/su10051609 article EN Sustainability 2018-05-17

Construction projects are associated with a number of uncertainties due to their expanse, complex nature, uniqueness, and dynamic states. Risks in construction are, indeed, the events or uncertain situations that can have negative positive consequences on project objectives. Many risks inherent affect each other. For example, time risk cost vice versa. The intertwined relations between factors ignored traditional assessment methods. To fulfill this gap, paper proposes an integrated fuzzy...

10.3846/jcem.2019.8280 article EN cc-by Journal of Civil Engineering and Management 2019-02-13

Contractor selection is a vital part of the project management cycle and deals with risk management. This paper presents contractors’ assessment based on multi‐attribute methods in competitive risky environment. The model evaluation contractors, determination their optimality criterion values according to Hodges‐Lehmann rule. proposed could be applied construction operations. attributes contractor are selected taking into consideration interests goals stakeholders as well factors that...

10.3846/1611-1699.2008.9.181-187 article EN cc-by Journal of Business Economics and Management 2008-09-30

This paper is aimed at utilizing a hybrid multi-criteria decision making (MCDM) model for selecting supplier. First, eight evaluation criteria, including cost, quality, distance, delivery reliability, reputation, technology level, compatibility and development ability are identified. The A nalytic H ierarchical P rocess (AHP) initially used calculating the weight of each criterion. CO mplex PR oportional AS sessment alternatives to G rey relations (COPRAS-G method) adopted ranking suppliers....

10.3846/20294913.2012.709472 article EN cc-by Technological and Economic Development of Economy 2012-10-01

The paper presents risk assessment of construction objects for the project commercial center construction. is based on multi-criteria decision making methods with fuzzy information. evaluation criteria are selected taking into consideration macro, mezzo and micro levels a project. Ranking determination their optimality determined by applying TOPSIS-F method values background presented proposed model provided key findings from analysis presented.

10.1016/j.procs.2013.05.018 article EN Procedia Computer Science 2013-01-01

Game theory usually analyses decision‐making processes in various fields. There are different methods of solving decision related problems. focuses on problem solution from one player s point view, while game emphasizes its analysis the interaction among many players. Much is concerned with finite, discrete games, which have a finite number players, moves, events, outcomes, etc. Many researchers research fields’ work applied in: construction engineering, management area. The article presents...

10.3846/tede.2010.22 article LT cc-by Technological and Economic Development of Economy 2010-06-16

Due to the increasing population and earth pollution, managing construction infrastructure projects with less damage environment pollution is very important. Sustainable development aims at reducing environment, making economical, comfort social justice. This study proposes fuzzy analytic hierarchy process (AHP) improved grey relational analysis (GRA) assess based on sustainable criteria. For doing so, criteria are first identified in economic, social, environmental dimensions using...

10.3390/su10040991 article EN Sustainability 2018-03-27

Preservation of cultural heritage is related with high costs and required interventions generally exceed available funding. It is, therefore, necessary to prioritise renovation interventions. Multi-criteria assessment can lead scientifically sound informed decisions about The paper presents the results research carried out purpose establishing a multi-criteria method for architectural heritage, specifically castles in Slovenia. explains methodology used develop method. Its main elements are...

10.3846/1648715x.2014.889771 article EN cc-by International Journal of Strategic Property Management 2014-03-21

Recently, risk assessment has become one of the most challenging issues in areas construction and public-private partnerships (PPPs). To address issues, various decision-making techniques have been proposed, each with its own specific disadvantages advantages. This paper investigates step-wise weight ratio analysis (SWARA), complex proportional (COPRAS), fuzzy analytic network process (FANP), hierarchy (FAHP), technique for order preference by similarity to ideal solution (FTOPSIS), simple...

10.3390/admsci8040080 article EN cc-by Administrative Sciences 2018-12-06

This study proposes a framework for the allocation of risk in public private partnerships (PPP) projects. Its contribution lies recognition and incorporation risks introduced by project stakeholders, as articulated principal-agent theory (PAT). The assesses routes these to those parties best equipped mitigate their impact on project. is facilitated thirteen-step process. practical benefit this outlining clear, systematic method allocating efficiently both government enterprise In so doing,...

10.3390/su11226455 article EN Sustainability 2019-11-16
Coming Soon ...