- Construction Project Management and Performance
- Multi-Criteria Decision Making
- BIM and Construction Integration
- Occupational Health and Safety Research
- Sustainable Building Design and Assessment
- Risk and Safety Analysis
- Public-Private Partnership Projects
- Facilities and Workplace Management
- Public Procurement and Policy
- Construction Management and Sustainability
- Optimization and Mathematical Programming
- Socio-economic Development and Sustainability
- Sustainable Supply Chain Management
- Strategic Planning and Analysis
- Underground infrastructure and sustainability
- Economic and Technological Systems Analysis
- Life Cycle Costing Analysis
- Complex Systems and Decision Making
- Market Dynamics and Volatility
- Value Engineering and Management
- Advanced Energy Technologies and Civil Engineering Innovations
- Economic and Business Development Strategies
- Quality and Supply Management
- Quality and Management Systems
- Geodetic Measurements and Engineering Structures
Vilnius Gediminas Technical University
2014-2025
Aquarius (Slovenia)
2012
The paper presents risk assessment of construction projects. is based on the multi‐attribute decision‐making methods. evaluation attributes are selected taking into consideration interests and goals stakeholders as well factors that have influence process efficiency real estate value. Ranking objects determination their optimality determined by applying TOPSIS grey COPRAS‐G methods with values at intervals. A background a description proposed model provided key findings analysis presented....
The higher life quality standards, the changes of habits and new well‐being requirements have led to an increase in demand for housing. Decision‐making problems construction management often involve a complex decision‐making process which multiple conditions be taken into consideration simultaneously. However, not every attribute used multidimensional scaling is equally precisely weighted real world. Thus quantitative qualitative assessments are required deal with uncertainty, subjective...
Risk management is an important field of construction industry and has gained more importance internationally due to the latest researches carried out on a large scale. However, this relatively new requires attention bring some benefit. Construction projects are facing number risks which have negative effects project objects such as time, cost quality. This study based findings questionnaire-based survey risk in Pakistan, reporting significance different type risk, ultimate responsibility...
Greening the supply chain is an increasingly important concern for many business enterprises and a challenge logistics management. Critical functions within green management are internal improvements selection of suppliers. This study proposes novel, hybrid model that addresses dependent relationships between various criteria vague information coming from decision-makers. The Decision-making Trial Evaluation Laboratory (DEMATEL) technique structures among criteria, thereby constructing...
Multi-attribute analysis is a useful tool in many economical, managerial, constructional, etc. problems.The accuracy of performance measures COPRAS (The multi-attribute COmplex PRoportional ASsessment alternatives) method usually assumed to be accurate.This assumes direct and proportional dependence the weight utility degree investigated versions on system attributes adequately describing alternatives values weights attributes.However, there some uncertainty involved all model inputs.The...
There is a number of criteria and associated sub‐criteria influencing the match managers to construction projects. Criteria were identified based on thorough review related literature interviews management personnel involved in project selection. Project characteristics are considered be less important for an effective management. The model multicriteria evaluation managers. embraces process manager This paper considers application grey relations methodology defining utility alternatives,...
The concept of the agile supply chain has been taken into account as means achieving a high competitive edge in rapidly changing business environments. Supply partner selection is one most appealing issues for management, which have recently studied by academicians and practitioners. Due to large number factors be considered, supplier process difficult task every company. Therefore, can viewed multiple attribute decision-making (MADM) problem. In this paper, novel hybrid MADM method proposed...
The accuracy of performance measures in common multicriteria methods is usually assumed to be accurate. Grey theory a new technique for performing prediction, relational analysis and decision‐making many areas. This paper presents applicability grey techniques defining the utility an alternative. Proposed assessment model covers well known method TOPSIS (Technique Order Preference by Similarity Ideal Solution), with attributes values determined at intervals (TOPSIS‐grey) Simple Additive...
Construction processes planning and effective management are extremely important for success in construction business. Head of a design must be well experienced initiating, planning, executing projects. Therefore, proper assessment projects' managers is vital part process. The paper deals with an methodology that might serve as decision support aid assessing project managers. Project managers' different characteristics considered to more or less the project. Qualifying based on laws force...
Multi-stakeholder based construction projects are subject to potential risk factors due dynamic business environment and stakeholders’ lack of knowledge. When solving project management tasks, it is necessary quantify the main indicators projects. Managing these requires suitable mitigation strategies evaluate analyse their severity. The existence information asymmetry also causes difficulties with achieving Pareto efficiency. Hence, ensure balanced satisfaction all participants, evaluation...
Existing risks in deep foundation excavation projects is a major issue developing cities. With the rapid in-crease number of various and big cities Iran, many accidents related to have been reported every year. These affected delay increased cost project implemen-tation. Therefore identification assessment these essential. The aim research was develop framework overcome limitations previous approaches assess projects. According complexity problem inherent uncertainty, adopted SWARA...
Nowadays, sustainable development has been introduced and integrated into production operation management field through the concept of green supply chain. Green regulations principles have gained interest managers practitioners in selecting innovative practices for suppliers organisations. Accordingly, present study aims to evaluate relationship between a supplier, innovation, environmental performance, competitive advantage cement industry, which is an important industry Iran. This...
An organization’s strategic objectives are accomplished through portfolios. However, the materialization of portfolio risks may affect a portfolio’s sustainable success and achievement those objectives. Moreover, project interdependencies cause–effect relationships between create complexity for risk analysis. This paper presents model using Bayesian network (BN) methodology modeling analyzing risks. To develop this model, first, portfolio-level caused by identified. Then, based on their all...
Construction projects are associated with a number of uncertainties due to their expanse, complex nature, uniqueness, and dynamic states. Risks in construction are, indeed, the events or uncertain situations that can have negative positive consequences on project objectives. Many risks inherent affect each other. For example, time risk cost vice versa. The intertwined relations between factors ignored traditional assessment methods. To fulfill this gap, paper proposes an integrated fuzzy...
Contractor selection is a vital part of the project management cycle and deals with risk management. This paper presents contractors’ assessment based on multi‐attribute methods in competitive risky environment. The model evaluation contractors, determination their optimality criterion values according to Hodges‐Lehmann rule. proposed could be applied construction operations. attributes contractor are selected taking into consideration interests goals stakeholders as well factors that...
This paper is aimed at utilizing a hybrid multi-criteria decision making (MCDM) model for selecting supplier. First, eight evaluation criteria, including cost, quality, distance, delivery reliability, reputation, technology level, compatibility and development ability are identified. The A nalytic H ierarchical P rocess (AHP) initially used calculating the weight of each criterion. CO mplex PR oportional AS sessment alternatives to G rey relations (COPRAS-G method) adopted ranking suppliers....
The paper presents risk assessment of construction objects for the project commercial center construction. is based on multi-criteria decision making methods with fuzzy information. evaluation criteria are selected taking into consideration macro, mezzo and micro levels a project. Ranking determination their optimality determined by applying TOPSIS-F method values background presented proposed model provided key findings from analysis presented.
Game theory usually analyses decision‐making processes in various fields. There are different methods of solving decision related problems. focuses on problem solution from one player s point view, while game emphasizes its analysis the interaction among many players. Much is concerned with finite, discrete games, which have a finite number players, moves, events, outcomes, etc. Many researchers research fields’ work applied in: construction engineering, management area. The article presents...
Due to the increasing population and earth pollution, managing construction infrastructure projects with less damage environment pollution is very important. Sustainable development aims at reducing environment, making economical, comfort social justice. This study proposes fuzzy analytic hierarchy process (AHP) improved grey relational analysis (GRA) assess based on sustainable criteria. For doing so, criteria are first identified in economic, social, environmental dimensions using...
Preservation of cultural heritage is related with high costs and required interventions generally exceed available funding. It is, therefore, necessary to prioritise renovation interventions. Multi-criteria assessment can lead scientifically sound informed decisions about The paper presents the results research carried out purpose establishing a multi-criteria method for architectural heritage, specifically castles in Slovenia. explains methodology used develop method. Its main elements are...
Recently, risk assessment has become one of the most challenging issues in areas construction and public-private partnerships (PPPs). To address issues, various decision-making techniques have been proposed, each with its own specific disadvantages advantages. This paper investigates step-wise weight ratio analysis (SWARA), complex proportional (COPRAS), fuzzy analytic network process (FANP), hierarchy (FAHP), technique for order preference by similarity to ideal solution (FTOPSIS), simple...
This study proposes a framework for the allocation of risk in public private partnerships (PPP) projects. Its contribution lies recognition and incorporation risks introduced by project stakeholders, as articulated principal-agent theory (PAT). The assesses routes these to those parties best equipped mitigate their impact on project. is facilitated thirteen-step process. practical benefit this outlining clear, systematic method allocating efficiently both government enterprise In so doing,...