Michał Marzec

ORCID: 0000-0002-8338-0672
Publications
Citations
Views
---
Saved
---
About
Contact & Profiles
Research Areas
  • Constructed Wetlands for Wastewater Treatment
  • Integrated Water Resources Management
  • Geology and Environmental Impact Studies
  • Phosphorus and nutrient management
  • Wastewater Treatment and Nitrogen Removal
  • Waste Management and Environmental Impact
  • Water Treatment and Disinfection
  • Sustainable Development and Environmental Management
  • Wastewater Treatment and Reuse
  • Botany and Plant Ecology Studies
  • Renewable energy and sustainable power systems
  • Geological Formations and Processes Exploration
  • Building energy efficiency and sustainability
  • Water Systems and Optimization
  • Groundwater and Isotope Geochemistry
  • Local Governance and Planning
  • Mining and Industrial Processes
  • Atmospheric and Environmental Gas Dynamics
  • Carbon dioxide utilization in catalysis
  • Renewable Energy and Sustainability
  • Fiber-reinforced polymer composites
  • Adsorption, diffusion, and thermodynamic properties of materials
  • Urban Development and Cultural Heritage
  • Scientific Research Methodologies and Applications
  • Urban Stormwater Management Solutions

University of Life Sciences in Lublin
2014-2024

AGH University of Krakow
2019-2023

University of Life Sciences in Poznań
2017

University of Economics and Innovation
2010-2014

Head Office of Geodesy and Cartography
2008

The aim of the work was to analyze effi ciency and reliability pollutants removal (total suspended solids -TSS, BOD 5 , COD) in a collective wastewater treatment plant with activated sludge hydroponic lagoon during its long term operation.The tested object designed treat infl owing through sewerage system delivered by septic truck.The projected capacity 1200 m 3 •d -1 .The technological for consisted mechanical part, fl biological reactor working according BARDENPHO process, secondary...

10.24425/aep.2020.134533 article EN cc-by-sa Archives of Environmental Protection 2023-04-01

In this paper, the pollutant removal efficiency and reliability of a vertical horizontal flow hybrid constructed wetland (CW) planted with common reed, manna grass, Virginia mallow were analyzed. The wastewater treatment plant, located in south-eastern Poland, treated domestic sewage at an average rate 2.5 m3/d. tests carried out during five years its operation (2014–2018). following parameters measured: biochemical oxygen demand (BOD5), chemical (COD), total suspended solids, nitrogen,...

10.3390/w10101445 article EN Water 2018-10-13

A thorough evaluation of measurement uncertainty together with control short-term and long-term precision measurements should be a basis any successful quality assurance/quality (QA/QC) strategy aimed at maintaining high the analytical process. Here we present results comprehensive assessment performance Picarro L2140-i CRDS laser spectrometer analysing δ2H, δ18O δ17O in water. The is based on obtained during 15 months continuous operation this instrument (February 2017 to May 2018)....

10.1080/10256016.2019.1609959 article EN Isotopes in Environmental and Health Studies 2019-04-30

Abstract The reliability of removal selected contaminants in three technological solutions the household sewage treatment plants was analysed this paper. plant with activated sludge, sprinkled biological deposit and hybrid reactor (activated sludge immersed trickling filter) analyzed. analysis performed using Weibull method for basic indicators impurities, BOD 5 , COD total suspended solids. active 70% 87% 66% In a deposit, values determined were: 30% (BOD ), 60% (COD) 67% (total solids)....

10.1515/jwld-2017-0078 article EN Journal of Water and Land Development 2017-12-01

1. Ávila C., Bayona J., Martín I., Salasc García J. 2015. Emerging organic contaminant removal in a full-scale hybrid constructed wetland system for wastewater treatment and reuse. Ecological Engineering, 7, 108–116. Google Scholar

10.12911/22998993/60464 article EN cc-by Journal of Ecological Engineering 2015-01-01

The paper presents an assessment of the impact sewage treatment plants with drainage system on quality groundwater in dug and deep wells Kwasowka village Inzynieria Ekologiczna

10.12912/2081139x.52 article EN DOAJ (DOAJ: Directory of Open Access Journals) 2014-10-01

The paper presents the results of a 3-year study on technological reliability and efficiency typical domestic wastewater treatment in two hybrid constructed wetland systems (CWs) located area Roztocze National Park (Poland). studied objects consist an initial settling tank system beds vertical flow (VF) horizontal (HF) (VF–HF) type with reed willow. rate wetlands was 0.4 1.0 m3/d, respectively. During period (2017–2019) 20 series analyses were performed 60 samples collected. Based obtained...

10.3390/w12123435 article EN Water 2020-12-07

The aim of the work is to present current state water and wastewater management in municipalities where Polesie National Park (PNP) located.The PNP situated Lublin Voivodeship, area six municipalities: Sosnowica, Hańsk, Urszulin, Stary Brus, Wierzbica Ludwin.The data used this paper, were obtained on basis surveys conducted these 2016 by Department Environmental Engineering Geodesy University Life Sciences Lublin.In analyzed communes, there was a very large disproportion between usage...

10.12911/22998993/77165 article EN cc-by Journal of Ecological Engineering 2017-10-29

The present paper reports pollutant removal efficiencies and reliability for a four-stage hybrid constructed wetland (HCW) consisting of the following sequence subsurface (SS), vertical flow (VF) horizontal (HF) beds: SSVF-SSHF-SSHF-SSVF. experiments were carried out over period three years, with sampling done in each season: winter, spring, summer autumn. Grab samples wastewater collected from different stages treatment tested total suspended solids (TSS), BOD5, COD, nitrogen (TN)...

10.3390/w12113153 article EN Water 2020-11-11

This study presents the efficiency of TSS and organic pollutants (BOD5 COD) removal in a hybrid constructed wetland wastewater treatment plant (VF-HF type) with an aeration system. was conducted over 6 years (2017–2022) facility capacity 4.5 m3/day located southeastern Poland designed to treat real domestic from school building. The studied consists three-chambered septic tank, pumping station system, two beds vertical horizontal flow planted giant miscanthus willow. As result artificial...

10.3390/w16070947 article EN Water 2024-03-25

Abstract Isotopic composition of precipitation ( 2 H /1 and 18 O/ 16 O isotope ratios, tritium content) is nowadays widely used in numerous applications environmental isotopes—most notably hydrology, climatology biogeochemistry. Here we present a long record (44 years) stable content monthly available for the Krakow station (southern Poland). only site Poland which long-term isotopic available. The data are discussed here context generally declining levels bomb global atmosphere growing...

10.1007/s11600-019-00367-2 article EN cc-by Acta Geophysica 2019-10-09

The results of research on the efficiency and technological reliability domestic wastewater purification in two household treatment plants (WWTPs) with activated sludge are presented this paper. studied facilities were located territory Roztocze National Park (Poland). mean flow rate WWTPs was 1.0 1.6 m3/day. In 2017–2019, 20 series analyses done, 40 samples taken. On basis received results, basic pollutant removal determined. tested specified using Weibull method. average efficiencies for...

10.3390/app11041889 article EN cc-by Applied Sciences 2021-02-21

Abstract The study investigated the efficiency of removal iron, manganese and indicator bacteria from potable groundwater by using carbonate-silica rock (opoka). tests were performed in a laboratory three filter columns supplied with water containing increased concentrations iron manganese. Two filled particle sizes 2-5 mm; retention time for was set at 1 h 2 h. A third column 1-2 mm particles, hydraulic High efficiencies determined coliform low psychro- mesophilic bacteria. An increase...

10.1515/jwld-2017-0054 article EN Journal of Water and Land Development 2017-09-26

The aim of this paper is to present the current state water and sewage management in communes where Roztocze National Park (RNP) located.The park located Lubelskie voivodship, territory four communes: Zamość, Zwierzyniec, Adamów Józefów, while its buffer zone Krasnobród, Tereszpol Szczebrzeszyn.The uses data from surveys conducted these municipalities 2016.On average, 68.9% population used supply system surveyed, 33.4% inhabitants had possibility discharging sewerage system.In area communes,...

10.12911/22998993/84764 article EN cc-by Journal of Ecological Engineering 2018-02-21

The paper presents an evaluation of the pollutant removal efficiencies four primary settling tanks that were components on-site domestic wastewater treatment plants located in Roztocze National Park Poland.We studied two four-chamber which elements technological lines activated sludge plants, and three-chamber provided hybrid constructed wetlands.The tests conducted years 2017-2019.During this period, samples for analysis collected from first chamber (raw wastewater) last (primary settled...

10.12911/22998993/122118 article EN cc-by Journal of Ecological Engineering 2020-06-10

The goal of the present study was to evaluate efficiency filters filled with Rockfos for removal phosphorus (Total-P) from domestic wastewater.Rockfos is a material obtained by calcination carbonate-silica rock (opoka) at temperature 900 °C.A field conducted in two volumes 2.0 and 0.8 m 3 which were components hybrid constructed wetlands an average capacity /L, located national parks south eastern Poland.Samples influent effluent analyzed Total-P concentrations pH.Eighty sewage samples...

10.12913/22998624/152527 article EN cc-by Advances in Science and Technology – Research Journal 2022-09-11
Coming Soon ...