Jun Wang

ORCID: 0000-0003-3384-4050
Publications
Citations
Views
---
Saved
---
About
Contact & Profiles
Research Areas
  • BIM and Construction Integration
  • Infrastructure Maintenance and Monitoring
  • 3D Surveying and Cultural Heritage
  • Construction Project Management and Performance
  • Manufacturing Process and Optimization
  • Evaluation and Optimization Models
  • Corporate Finance and Governance
  • Higher Education and Teaching Methods
  • Recycled Aggregate Concrete Performance
  • Innovations in Concrete and Construction Materials
  • Simulation and Modeling Applications
  • Advanced Manufacturing and Logistics Optimization
  • E-commerce and Technology Innovations
  • Building Energy and Comfort Optimization
  • Advanced Computational Techniques and Applications
  • Geological and Geophysical Studies
  • Evaluation Methods in Various Fields
  • Innovative concrete reinforcement materials
  • Concrete Corrosion and Durability
  • Advanced Decision-Making Techniques
  • Safety and Risk Management
  • Underground infrastructure and sustainability
  • Quality and Supply Management
  • Geomechanics and Mining Engineering
  • Collaboration in agile enterprises

Western Sydney University
2021-2025

Wuhan University of Technology
2011-2025

Changchun University of Technology
2025

Nanjing Tech University
2025

National Research Center for Rehabilitation Technical Aids
2025

Shanghai Electric (China)
2024

Fudan University
2003-2024

Henan University of Technology
2010-2024

Sichuan University
2012-2024

Nanjing Hydraulic Research Institute
2022-2024

Bridges are critical infrastructure, and effective operation maintenance (O&M) is essential for ensuring the good condition of bridges. Owing to increasing complexity modern bridges availability information technologies (e.g. sensors, laser scanners, ultrasonic radar) collection massive data, bridge O&M decision-making gradually shift toward a data-driven manner. However, both industry academia still do not have common understanding latest progress, challenges, trends decision-making. Thus,...

10.1080/15732479.2020.1833946 article EN Structure and Infrastructure Engineering 2020-11-09

Considering facilities management (FM) at the early design stage could potentially reduce efforts for maintenance during operational phase of facilities. Few in construction industry have involved facility managers into phase. It was suggested that adoption will contribute to reducing needs major repairs and alternations otherwise occur There should be an integrated data source providing information support building lifecycle. is envisaged Building Information Modelling (BIM) would fill gap...

10.1155/2013/189105 article EN cc-by Advances in Civil Engineering 2013-01-01

Objectives . A key challenge in evaluating the impact of community-based participatory research (CBPR) is identifying what mechanisms and pathways are critical for health equity outcomes. Our purpose to provide an empirical test CBPR conceptual model address this challenge. Methods three-stage quantitative survey was completed: (1) 294 US projects with federal funding were identified; (2) 200 principal investigators completed a questionnaire about project-level details; (3) 450 community or...

10.1155/2018/7281405 article EN cc-by BioMed Research International 2018-01-01

The uses of building information modeling (BIM) in and infrastructure projects are numerous. Most previous BIM case examples focused on buildings, limited studies have reported the adoption use projects. Therefore, this research aims to analyze compare projects, particularly constructing major road Australia People's Republic China. related associated technologies were analyzed based a study approach. Subsequently, number comparative analyses conducted cultural managerial aspects between as...

10.1061/(asce)me.1943-5479.0000460 article EN Journal of Management in Engineering 2016-06-30
Coming Soon ...